Roof System:
R-30 ISO insulation with mechanically attached Mule-Hide TPO membrane
Wall System:
Multicolor 12-inch flush mount wall panels installed throughout all buildings Size: Nine multi-unit buildings
Installation Timeline:
Three phases over the course of one year
Panel Forming:
Standing seam panels site-formed using a New Tech panel machine
Material Source:
Coil supplied by Sheffield Metals in metallic silver
Trim Fabrication:
All coping and trim metals fabricated in-house by Metal Werks LLC (sister company) Warranty Coverage
Membrane Warranty:
20-year NDL Mule-Hide manufacturer’s warranty



